Structure Fire Spine street Factory complex - brick & steel with numerous occupancies.
Structure involved 20 x 30m
520A calls 2nd Alarm
518A second pump to arrive, becomes control vehicle.
Responding also :
513A
512A
530A
BO11
502I
501T
Partial collapse of steel structure
2 lines case 3
850O - on standby -still at Carindale PCYC
Spine Street - Structure Fire 2nd Alarm
-
- Registered User
- Posts: 71
- Joined: Mon Apr 25, 2011 10:25 am
Spine Street - Structure Fire 2nd Alarm
Last edited by techo on Fri Sep 16, 2011 7:20 pm, edited 1 time in total.
-
- Registered User
- Posts: 71
- Joined: Mon Apr 25, 2011 10:25 am
Re: Spine Street - Structure Fire 2nd Alarm
1915 : BA team locates hazardous materials - paint or paint related material or varnish
Scientific requested
1918: stop on the CAFS truck - not on other vehicles.
Fire under control. damping down.
Scientific requested
1918: stop on the CAFS truck - not on other vehicles.
Fire under control. damping down.